Under Paragraph MA.2 of Schedule 2, Part 3 of the GPDO 2015, a Local Planning Authority assessing a Class MA Prior Approval application can only consider eight statutory matters: (1) transport and highways impacts, (2) contamination risks, (3) flooding risks, (4) impacts of noise from commercial premises on the intended occupiers, (5) conservation area ground-floor character impacts, (6) the provision of adequate natural light in all habitable rooms, (7) impacts on intended occupiers from nearby heavy industrial/waste/port uses, and (8) where converting a nursery or health centre, the impact on local provision of those services.

Want to check your exact property or address?Check Your Postcode Now

Search Live Council Planning Applications by Postcode

Enter any UK postcode to check live council planning applications, permitted development & appeals near you:

Quick postcodes:

The 8 Statutory Class MA Prior Approval Tests (Paragraph MA.2(2) GPDO)

When you submit an application for Prior Approval under Class MA, the Local Planning Authority cannot assess the application as if it were a full planning application. Instead, Paragraph MA.2(2) of the GPDO restricts the council strictly to assessing the following eight statutory matters (plus compliance with Nationally Described Space Standards and the Fire Risk Statement rule for tall buildings):

Statutory GPDO ClausePrior Approval Assessment MatterTypical Technical Report RequiredPrimary Risk of Refusal
MA.2(2)(a)Transport and highways impacts of the developmentTransport Note, Cycle Storage Plan & Refuse Collection StrategyLack of safe bin storage, cycle racks, or severe on-street parking stress
MA.2(2)(b)Contamination risks in relation to the buildingPhase 1 Desktop Geo-Environmental / Contamination ScreeningFormer dry cleaners, petrol workshops, or printworks with solvent history
MA.2(2)(c)Flooding risks in relation to the buildingSite-Specific Flood Risk Assessment (FRA) if in Flood Zone 2 or 3Ground-floor or basement sleeping accommodation in Flood Zone 3
MA.2(2)(d)Impacts of noise from commercial premises on intended occupiersBS 8233 / BS 4142 Acoustic & Noise Impact AssessmentAdjoining restaurants, pubs, air-conditioning plant, or commercial delivery yards
MA.2(2)(e)In a Conservation Area (ground floor only): impact on character & sustainabilityHeritage & Town Centre Retail Vitality StatementCreating a 'dead residential frontage' on a historic shopping parade
MA.2(2)(f)Provision of adequate natural light in all habitable roomsBRE 209 / BS EN 17037 Internal Daylight & Sunlight ReportDeep-plan rear bedrooms or living areas with low daylight factors
MA.2(2)(g)Impact on intended occupiers of introducing residential use in an industrial/waste/port areaIndustrial Neighbour Compatibility & Agent of Change AssessmentSiting flats next to B2 general industry, scrapyards, or 24-hour distribution hubs
MA.2(2)(h) & (i)Where converting a Class E(e) health centre or E(f) nursery: impact on local provisionLocal Healthcare / Childcare Needs & Capacity AuditClosing an active GP surgery or nursery in an area with waiting lists

Fire Safety Prior Approval Rule for Buildings Over 18 Metres (7+ Storeys)

Introduced following the Building Safety Act reforms, Paragraph MA.2(4) of the GPDO imposes an additional mandatory test where the building exceeds 18 metres in height or contains 7 or more storeys: the applicant must submit a formal Fire Safety Statement detailing the fire safety design principles, concepts, and standards that have been applied to the development, and the LPA must consult the Health and Safety Executive (Building Safety Regulator).

What Is the 'Agent of Change' Principle in Clause MA.2(2)(d) & (g)?

Paragraph 193 of the National Planning Policy Framework (NPPF) establishes the 'Agent of Change' principle: existing commercial businesses and industrial venues should not have unreasonable restrictions placed on them because new flats are converted next door. Therefore, the burden is 100% on the Class MA applicant to prove that acoustic insulation and mechanical ventilation (MVHR) will protect flat residents from commercial noise.

Ground-Floor Conversions in Conservation Areas (Clause MA.2(2)(e))

While upper-floor offices above shops in a Conservation Area can be converted under Class MA without triggering heritage frontage tests, converting any part of the ground floor in a Conservation Area triggers Clause MA.2(2)(e).

Under this test, the council will assess two limbs: (1) the impact of that change of use on the character or appearance of the Conservation Area, and (2) the sustainability of the Conservation Area where the change of use involves the loss of services provided by the Class E building. If the property sits on a primary shopping frontage, councils frequently refuse ground-floor residential conversion unless you retain a small commercial Class E unit at the front of the ground floor and convert only the rear and upper storeys into C3 flats.

Mandatory Class MA Validation Document Checklist

Under Paragraph W of Part 3 of the GPDO, your application will be invalidated or refused unless it includes these core items:

Step-by-Step Procedure:
A written description of the proposed development, including the exact number of proposed C3 residential units.
A scaled Location Plan (1:1250 or 1:2500) showing the red-line application boundary and access to the public highway.
Existing and Proposed Floorplans drawn to an identified metric scale (1:50 or 1:100) clearly labelling Gross Internal Area (GIA) in sqm for every flat, bedroom sizes, storage cupboards, and every window.
Evidence of 2 continuous years of Class E commercial use (lease agreements, VOA business rates records, or utility statements).
Specialist technical reports addressing Clauses (a) to (i)—specifically a BS EN 17037 Daylight Report, BS 8233 Noise Report, Transport/Cycle/Bin Plan, and Phase 1 Contamination Statement.

Follow Property Due Diligence on Google

Official Feed

Add our domain as a preferred source to receive priority property law guides, Land Registry data releases, and statutory alerts directly in your Google app & Discover feed.

100% Free Baseline Report • No Sign-Up or Password Required
Instant 3-Second Statutory Screening

Check Any Property Across 12 Official Statutory Registers

Conducting property due diligence requires cross-referencing multiple public registries. Run a free instant desktop screening across Environment Agency flood models, British Geological Survey subsidence data, UKHSA radon maps, HM Land Registry sold prices, and local planning constraints.

Environment Agency FloodingSurface water, rivers & sea risk bands
BGS Ground StabilityShrink-swell clay & subsidence risk
UKHSA Radon Gas PotentialOfficial radon class & protection rules
HM Land Registry PricesHistorical transactions & tenure type
EPC Energy & RdSAP SpecsOfficial construction era & wall fabric
Planning Applications BufferRecent nearby planning notices (500m)
✓ Zero payment details required✓ Instant automated browser report✓ Direct links to official statutory sources
UK Statutory Due Diligence Silo

Official Primary Verification Registers

Cross-reference property diligence across verified UK government open registers under the Open Government Licence v3.0:

Category: Council & Planning
Need all 7 statutory checks compiled for a specific property? Run a Free Baseline Due Diligence Report:
Run Combined Search
Free Statutory Diligence

Inspect Any UK Property on Our UK Planning Applications Finder

Run an instant preliminary screening across official government databases including the MHCLG EPC register, HM Land Registry, and Environment Agency records.

Launch UK Planning Applications Finder

Official Statutory Notice & Guidance:

This guide is compiled for informational due diligence referencing official statutory records from GPDO 2015 (Schedule 2, Part 3, Class MA) & Levelling-up Act 2023 under the Open Government Licence v3.0. Legal titles and physical structural condition should always be independently inspected by a qualified conveyancing solicitor and chartered RICS surveyor prior to legally binding property commitments.