Quick Answer: Section 6 Party Wall Notice: Rules, Distances, and Foundation Requirements

Under Section 6 of the Party Wall etc. Act 1996, you must serve a statutory excavation notice if you dig foundations within 3 metres of a neighbour's building to a depth lower than the base of their foundations (Section 6(1)), or within 6 metres if any part of your excavation cuts below a 45-degree plane projected downwards from the underside of their foundations (Section 6(2)). Section 6 notices require exactly 1 month's advance statutory notice and MUST be accompanied by scale architectural plans and foundation cross-sections showing excavation depths.

Want to check your exact property or address?Check Your Postcode Now

Check Your Property on the Party Wall Notice Generator

Enter any UK house number & postcode to run an instant statutory lookup:

Quick postcodes:

The 3-Metre vs 6-Metre Excavation Tests Explained

Section 6 of the Party Wall etc. Act 1996 is the most frequently triggered section of the Act for domestic extensions. Many homeowners wrongly believe that because their planned extension sits 1 or 2 metres away from the boundary line and does not touch the shared wall, the Act does not apply. This is a severe legal error.

Section 6 is designed to protect neighbouring properties from ground subsidence, settlement, and heave caused by adjacent trench digging and soil extraction. It establishes two distinct geographic tests:

1. The 3-Metre Rule (Section 6(1)): If you propose to excavate or erect a building within 3 metres of any part of a building or structure belonging to an adjoining owner, and your excavation will penetrate to a lower level than the bottom of their foundations, you MUST serve a Section 6(1) Notice at least 1 month before digging.

Because older Victorian, Edwardian, and 1930s houses often sit on shallow corbelled brick foundations just 400mm–600mm deep, modern Building Regulations strip footings (typically 1,000mm–1,200mm deep) will almost always be deeper than your neighbour's foundations. Consequently, virtually all extensions within 3 metres require a Section 6 notice.

2. The 6-Metre Rule (Section 6(2)): If you propose to excavate within 6 metres of a neighbour's structure, and any part of the excavation cuts below a line projected downwards at an angle of 45 degrees to the horizontal from the bottom of their foundations, you MUST serve a Section 6(2) Notice at least 1 month prior.

The 6-metre rule typically catches deep basement excavations, stepped retaining walls, drainage shafts, swimming pools, and piled foundations.

Section 6 Excavation Rules Summary
Statutory RuleDistance From Neighbour's WallDepth TriggerNotice Period Required
Section 6(1)Within 3.0 metres (9.84 ft)Deeper than base of neighbour's existing footings1 Month
Section 6(2)Between 3.0 and 6.0 metres (19.68 ft)Below 45-degree line from base of neighbour's footings1 Month
Beyond 6.0 MetresGreater than 6.0 metresNo statutory party wall trigger (common law only)None under 1996 Act

Mandatory Engineering Drawing Requirements

Under Section 6(6), the notice is not legally served unless it is accompanied by drawings and sections.

Your notice must include:

• A scale site block plan showing the exact distance in millimetres between the proposed excavation trench and the neighbour's nearest external walls.

• A structural cross-section showing the depth of your proposed concrete footings or trench alongside the assumed or investigated foundation depth of the adjoining structure.

If your structural engineer has not yet finalised foundation depth calculations, you cannot legally serve a Section 6 notice.

Right to Request Underpinning or Safeguards

Under Section 6(3), an adjoining owner has the statutory right to request that the building owner underpinning their adjoining wall at the building owner's expense if necessary to safeguard its stability. These technical details are formalized in the Party Wall Award.

Section 6 Compliance Checklist for Extensions

Follow this checklist before digging foundation trenches near a neighbouring home:

Step-by-Step Procedure:
Measure the physical distance between your proposed foundation edge and your neighbour's wall.
Ask your structural engineer or architect for a cross-sectional foundation detail drawing.
Serve the Section 6 notice at least 30 calendar days before the groundworks contractor mobilises.
Ensure your notice explicitly states whether Section 6(1) or Section 6(2) applies.
Arrange trial pit investigations if foundation depths of the neighbouring building are uncertain.

Follow Property Due Diligence on Google

Official Feed

Add our domain as a preferred source to receive priority property law guides, Land Registry data releases, and statutory alerts directly in your Google app & Discover feed.

100% Free Baseline Report • No Sign-Up or Password Required
Instant 3-Second Statutory Screening

Check Any Property Across 12 Official Statutory Registers

Conducting property due diligence requires cross-referencing multiple public registries. Run a free instant desktop screening across Environment Agency flood models, British Geological Survey subsidence data, UKHSA radon maps, HM Land Registry sold prices, and local planning constraints.

Environment Agency FloodingSurface water, rivers & sea risk bands
BGS Ground StabilityShrink-swell clay & subsidence risk
UKHSA Radon Gas PotentialOfficial radon class & protection rules
HM Land Registry PricesHistorical transactions & tenure type
EPC Energy & RdSAP SpecsOfficial construction era & wall fabric
Planning Applications BufferRecent nearby planning notices (500m)
✓ Zero payment details required✓ Instant automated browser report✓ Direct links to official statutory sources
UK Statutory Due Diligence Silo

Official Primary Verification Registers

Cross-reference property diligence across verified UK government open registers under the Open Government Licence v3.0:

Category: Party Wall & Boundary Diligence
Need all 7 statutory checks compiled for a specific property? Run a Free Baseline Due Diligence Report:
Run Combined Search
Free Statutory Diligence

Inspect Any UK Property on Our Party Wall Notice Generator

Run an instant preliminary screening across official government databases including the MHCLG EPC register, HM Land Registry, and Environment Agency records.

Launch Party Wall Notice Generator

Official Statutory Notice & Guidance:

This guide is compiled for informational due diligence referencing official statutory records from Party Wall etc. Act 1996 (Section 6) under the Open Government Licence v3.0. Legal titles and physical structural condition should always be independently inspected by a qualified conveyancing solicitor and chartered RICS surveyor prior to legally binding property commitments.