How Is CIL Charge Calculated in the UK? (Statutory Formula & Indexation)

Statutory Source: Community Infrastructure Levy Regulations 2010 (Regulation 40, as amended)

Quick Answer: How Is CIL Charge Calculated in the UK? (Statutory Formula & Indexation)

Community Infrastructure Levy (CIL) is calculated using the statutory formula set out in Regulation 40 of the Community Infrastructure Levy Regulations 2010 (as amended): CIL Charge = (Gross Chargeable Area in m² × Adopted CIL Charging Schedule Rate £/m² × Indexation Factor for Planning Grant Year) ÷ Indexation Factor for Schedule Adoption Year. Chargeable area is calculated as the Net Additional Gross Internal Area (GIA), meaning the floorspace of existing permanent buildings demolished or converted can be deducted if they were in continuous lawful use for at least 6 months during the previous 3 years.

Want to check your exact property or address?Check Your Postcode Now

Check Your Property on the CIL Rate & Liability Calculator

Enter any UK house number & postcode to run an instant statutory lookup:

Quick postcodes:

The Regulation 40 Mathematical Formula

Under Regulation 40 of the CIL Regulations 2010 (as amended by the 2019 Regulations), the collecting authority must calculate the levy liability using the formula:

Liability = (R × A × Ip) ÷ Ic

Where:

• R is the charging authority's base rate (£/m²) for that specific use class and geographical zone.

• A is the net additional chargeable area (m²) measured in Gross Internal Area under RICS Code.

• Ip is the index figure for the calendar year in which planning permission was granted.

• Ic is the index figure for the calendar year in which the charging schedule took effect.

National RICS CIL Index Multipliers Over Time
Calendar YearRICS CIL Index FigureRelative Inflation vs 2015 BaseImpact on £100/m² Base Rate
2015258Baseline (1.00x)£100.00 / m²
2018313+21.3% (1.21x)£121.32 / m²
2021332+28.7% (1.29x)£128.68 / m²
2024381+47.7% (1.48x)£147.67 / m²
2026415 (est.)+60.8% (1.61x)£160.85 / m²

Deducting Existing Buildings: The 6-in-36 Month Lawful Use Rule

Developers can dramatically reduce their CIL bill by claiming existing in-use building deductions under Regulation 40(7).

To qualify, the existing building must be a permanent structure and must have been in continuous lawful commercial or residential use for an unbroken period of at least 6 months within the 3 years (36 months) ending on the day planning permission was granted.

Follow Property Due Diligence on Google

Official Feed

Add our domain as a preferred source to receive priority property law guides, Land Registry data releases, and statutory alerts directly in your Google app & Discover feed.

100% Free Baseline Report • No Sign-Up or Password Required
Instant 3-Second Statutory Screening

Check Any Property Across 12 Official Statutory Registers

Conducting property due diligence requires cross-referencing multiple public registries. Run a free instant desktop screening across Environment Agency flood models, British Geological Survey subsidence data, UKHSA radon maps, HM Land Registry sold prices, and local planning constraints.

Environment Agency FloodingSurface water, rivers & sea risk bands
BGS Ground StabilityShrink-swell clay & subsidence risk
UKHSA Radon Gas PotentialOfficial radon class & protection rules
HM Land Registry PricesHistorical transactions & tenure type
EPC Energy & RdSAP SpecsOfficial construction era & wall fabric
Planning Applications BufferRecent nearby planning notices (500m)
✓ Zero payment details required✓ Instant automated browser report✓ Direct links to official statutory sources
UK Statutory Due Diligence Silo

Official Primary Verification Registers

Cross-reference property diligence across verified UK government open registers under the Open Government Licence v3.0:

Category: Planning Charges & Development Levies
Need all 7 statutory checks compiled for a specific property? Run a Free Baseline Due Diligence Report:
Run Combined Search
Free Statutory Diligence

Inspect Any UK Property on Our CIL Rate & Liability Calculator

Run an instant preliminary screening across official government databases including the MHCLG EPC register, HM Land Registry, and Environment Agency records.

Launch CIL Rate & Liability Calculator

Official Statutory Notice & Guidance:

This guide is compiled for informational due diligence referencing official statutory records from Community Infrastructure Levy Regulations 2010 (Regulation 40, as amended) under the Open Government Licence v3.0. Legal titles and physical structural condition should always be independently inspected by a qualified conveyancing solicitor and chartered RICS surveyor prior to legally binding property commitments.